Sign In | Join Free | My disqueenfrance.com
China Chongqing Gold Mechanical & Electrical Equipment  CO.,LTD logo
Chongqing Gold Mechanical & Electrical Equipment CO.,LTD
Active Member

10 Years

Home > Geophysical Exploration Equipment >

Gdg-1A Underwater Monitor For Concrete Elevation Filling Pile

Chongqing Gold Mechanical & Electrical Equipment CO.,LTD

Gdg-1A Underwater Monitor For Concrete Elevation Filling Pile

Place of Origin : china

Brand Name : gold

Model Number : GDG-1A

Packaging Details : wooden case

Payment Terms : TT/LC/DA

MOQ : 1 piece

Contact Now

Gdg-1A Underwater Monitor For Concrete Elevation Filling Pile

Purpose:

The instrument is special instrument used to detect and determine elevation of concrete filling pile. It is suitable to detect concrete elevation of filling pile underwater as per Shanghai Industry Standard DGJ08-11 “Design Code for Building Foundation” and DBJ08-202 “Bored Pile Construction Specification”, or similar specification of other province. It is also suitable to detect concrete elevation of filling pile underwater for other piles

Adopts computer techniques, it can collect, analyze, calculate and process signal automatically. It has characteristics of accurate data collection, rapid answer time, high automation, reliable test data, and timely sound and light alarm, so the operator can determine and control preset position of filling pile effectively. This solves the problem that there is no instrument to detect concrete elevation of filling pile in the past. It can highly improve qualification rate of filling pile. It is the best instrument for companies and institutes, which are for high building, road and bridge, harbor and dock, marine oil platform construction.

Technical parameters

1. Preset position range: 0~30m (It can be extended to more than 50 mm for special order);

2. Preset position error: ±0.3 m;

3. Size of measurement probe: Φ50mm×980mm;

4. Weight of measurement probe: 7.5 kg;

5. Operation condition:

(1) Ambient temperature:

a. Controlling unit: -10℃~50℃;

b. Measurement probe: 0℃~40℃;

(2) Relative humidity:

a. Controlling unit: ≤90%;

6. Power supply: AC 220V±10%, 50 Hz, 20 W; or uninterrupted power supply (AC 220V sine wave);

7. Measurement mode: sampling in real time at fixed point;


Product Tags:

water finder

      

water detecting finder

      

high precision finder

      
China Gdg-1A Underwater Monitor For Concrete Elevation Filling Pile wholesale

Gdg-1A Underwater Monitor For Concrete Elevation Filling Pile Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Chongqing Gold Mechanical & Electrical Equipment CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0